Facility Area
Second Floor: 2400sqm
First Floor: 1100sqm
Ground Floor: 1100sqm
Timescales
Concept Design Commenced: January 2016
Start on Site: January 2017
Completion: November 2018
Contract Value
The Value of the construction works excluding equipment was £12.5m ( including equipment £75m).
Project
Ellipta Ph4, S1 & S2 Buildings, GSK Ware. Project involved the refurbishment and remodelling of 5,000sqm of Respiratory Manufacturing space, to accommodate new Filling, Assembly and Packing Production equipment.
The works to ground first and second floor involved the strip-out of the existing facilities back to shell and new clean room fitout. The project involved installation of a new 1000sqm plant deck at roof level to accommodate new prefabricated plant rooms and HV Substation. and a new extension to accommodate stair and lift core to roof level.
Scope of Services
Simons Design provided an integrated design team to support, architectural, M&E and Structural design services to develop Concept, Scheme and Detail Design proposals and technical support throughout the pre-construction and construction phases, to handover. The design proposals were developed in BIM to enable detailed coordination of the facility and services installation.